CSI MasterFormat Divisions: Full List and How Estimators Use It

Every MasterFormat division from 00 to 49 in one table, what each one covers, how the six-digit section numbers work, and how estimators organize bids with it.

Estimate sheet organized by CSI divisions with a calculator

By the Nextron Estimating team ยท Updated November 3, 2026

Key takeaways
  • MasterFormat is the standard system for organizing construction specifications and cost information in the USA and Canada.
  • It has 50 division numbers, from 00 to 49. Several numbers are reserved for future use.
  • Sections use six-digit numbers, such as 09 29 00 for gypsum board, that move from broad to specific.
  • Estimators use the same divisions to organize bids, so scope can be checked against the specifications line by line.

If you have opened a project manual or a commercial estimate, you have seen MasterFormat. It is the numbering system that puts concrete in Division 03, finishes in Division 09 and electrical in Division 26. This guide lists every division, explains how the numbering works and shows how estimators use MasterFormat to build bids that match the specifications.

What Is CSI MasterFormat?

MasterFormat is a standard for organizing construction information, published by the Construction Specifications Institute (CSI) in the USA and Construction Specifications Canada (CSC). It gives every type of work a fixed place and number, so architects, engineers, contractors, suppliers and estimators all refer to the same work in the same way.

It is used to organize project specifications, cost estimates, bid packages, product data and project records. Because everyone uses the same structure, a contractor can match a line in the estimate to the exact section of the specification that describes the work.

From 16 Divisions to 50

For many years MasterFormat had 16 divisions, and older estimators still remember mechanical work in Division 15 and electrical work in Division 16. In 2004, CSI and CSC expanded MasterFormat to 50 divisions to make room for building systems, site work and process equipment that had outgrown the old structure. Today, mechanical work is split into Divisions 21, 22 and 23, and electrical work into Divisions 26, 27 and 28.

Complete CSI MasterFormat Divisions List

The divisions are grouped into a procurement and contracting group (Division 00) and a specifications group, which is split into general requirements, facility construction, facility services, site and infrastructure, and process equipment.

DivisionTitleWhat it covers
00Procurement and Contracting RequirementsBid forms, instructions to bidders, contracts, bonds and conditions of the contract
01General RequirementsProject administration, temporary facilities, quality requirements and closeout
02Existing ConditionsSurveys, demolition, abatement and site remediation
03ConcreteFormwork, reinforcing, cast-in-place and precast concrete
04MasonryBrick, concrete block, stone and mortar
05MetalsStructural steel, steel joists, metal deck and miscellaneous metals
06Wood, Plastics, and CompositesRough carpentry, finish carpentry and architectural woodwork
07Thermal and Moisture ProtectionWaterproofing, insulation, roofing, flashing, joint sealants and fireproofing
08OpeningsDoors, frames, windows, storefronts, curtain wall, hardware and glazing
09FinishesGypsum board, tile, ceilings, flooring, painting and wall coverings
10SpecialtiesToilet partitions, signage, lockers, fire extinguishers and accessories
11EquipmentKitchen, laboratory, athletic, residential and other equipment
12FurnishingsCasework, countertops, window treatments and furniture
13Special ConstructionPre-engineered structures, pools and special purpose rooms
14Conveying EquipmentElevators, escalators, lifts and dumbwaiters
15 to 20ReservedReserved for future expansion
21Fire SuppressionSprinkler systems, standpipes and fire pumps
22PlumbingPiping, fixtures, water heaters and plumbing equipment
23Heating, Ventilating, and Air Conditioning (HVAC)Ductwork, HVAC equipment, piping, air distribution and controls
24ReservedReserved for future expansion
25Integrated AutomationIntegrated building automation and control networks
26ElectricalPower distribution, wiring, lighting and electrical equipment
27CommunicationsData, voice, audio-visual and structured cabling
28Electronic Safety and SecurityFire alarm, access control, intrusion detection and video surveillance
29 to 30ReservedReserved for future expansion
31EarthworkSite clearing, grading, excavation, fill and soil stabilization
32Exterior ImprovementsPaving, curbs, fencing, landscaping and irrigation
33UtilitiesWater, sanitary sewer, storm drainage and site power utilities
34TransportationRail, roadway and airfield construction
35Waterway and Marine ConstructionDocks, dredging, seawalls and marine structures
36 to 39ReservedReserved for future expansion
40Process InterconnectionsProcess piping and interconnections between process equipment
41Material Processing and Handling EquipmentConveyors, cranes, hoists and material handling
42Process Heating, Cooling, and Drying EquipmentIndustrial heating, cooling and drying equipment
43Process Gas and Liquid Handling, Purification, and Storage EquipmentPumps, compressors, tanks and treatment equipment
44Pollution and Waste Control EquipmentAir pollution control and waste handling equipment
45Industry-Specific Manufacturing EquipmentEquipment for specific manufacturing industries
46Water and Wastewater EquipmentTreatment equipment for water and wastewater plants
47ReservedReserved for future expansion
48Electrical Power GenerationPower generation equipment, such as solar, wind and generators
49ReservedReserved for future expansion

How Many Divisions Are in MasterFormat?

MasterFormat has 50 division numbers, from 00 to 49. Some numbers, such as 15 to 20, 24, 29, 30, 36 to 39, 47 and 49, are reserved for future use and contain no sections. That is why you may see MasterFormat described as having 50 divisions, even though fewer are in active use.

How MasterFormat Section Numbers Work

Each section has a six-digit number written in three pairs. The first pair is the division, the second pair is the broad subject within that division and the third pair narrows it further. Numbers can extend with a decimal for even more detail.

NumberLevelExample
09DivisionFinishes
09 20 00Level 2Plaster and Gypsum Board
09 29 00Level 3Gypsum Board
03 30 00Level 2Cast-in-Place Concrete
26 05 19Level 3Low-Voltage Electrical Power Conductors and Cables

Sections ending in 05 often cover common work results for that division, such as hangers, supports and identification that apply to many systems.

How Estimators Use MasterFormat

  • Organizing the estimate: commercial estimates are usually broken into the same divisions as the specifications, so the owner and design team can follow them.
  • Checking scope: reading the specification section by section helps catch work that is written but not drawn, such as testing, mock-ups or attic stock.
  • Bid packages: general contractors split work into subcontract packages by division or section, which makes it easier to compare subcontractor quotes.
  • Cost history: keeping past costs by division makes it easier to build budgets and check new estimates.
  • Change orders: pricing changes by section keeps the change linked to the right specification and contract value.

Not every estimate follows MasterFormat. Subcontractors often organize by their own trade breakdown, and homebuilders may organize by construction phase. At Nextron Estimating, we prepare estimates by CSI division or trade by trade, depending on what the client needs. See how a division-based estimate looks in our sample estimates.

MasterFormat vs UniFormat

MasterFormat organizes information by work results and products, such as concrete, gypsum board or plumbing fixtures. UniFormat organizes information by building elements or systems, such as foundations, exterior walls or roofing. UniFormat is often used for early design-stage estimates, when systems are known but specific products are not. MasterFormat is used for construction documents and detailed bid estimates.

MasterFormatUniFormat
Organized byWork results and productsBuilding elements and systems
Typical useSpecifications and bid estimatesEarly budgets and design-stage estimates
Example09 29 00 Gypsum BoardB2010 Exterior Walls
Best stageConstruction documentsConcept and schematic design

Divisions Most Contractors Work In

On a typical commercial building, most of the cost falls in a handful of divisions: 03 Concrete, 05 Metals, 07 Thermal and Moisture Protection, 08 Openings, 09 Finishes, 21 to 23 for fire protection, plumbing and HVAC, 26 Electrical and 31 to 33 for site work. Each of these has its own estimating methods and common mistakes. Our trade guides explain them in detail, for example concrete estimating, drywall estimating and electrical estimating.

Frequently Asked Questions

What are the CSI MasterFormat divisions?

They are the 50 numbered categories, from 00 to 49, that organize construction specifications and cost information, such as 03 Concrete, 09 Finishes, 23 HVAC and 26 Electrical.

How many CSI divisions are there?

MasterFormat has 50 division numbers, from 00 to 49. Several are reserved for future use, so fewer are active.

What happened to the old 16 CSI divisions?

MasterFormat had 16 divisions until 2004, when it was expanded to 50. Old Division 15 Mechanical and Division 16 Electrical were split into Divisions 21 to 23 and 26 to 28.

What is Division 01 in construction?

Division 01 General Requirements covers project administration, temporary facilities, quality requirements, submittals and closeout that apply to the whole project.

What division is drywall in?

Gypsum board is in Division 09 Finishes, in section 09 29 00 Gypsum Board, with assemblies covered under related Division 09 sections.

What division is HVAC?

HVAC is Division 23. Fire suppression is Division 21 and plumbing is Division 22.

What division is electrical?

Electrical is Division 26. Communications is Division 27, and electronic safety and security, including fire alarm, is Division 28.

Who publishes MasterFormat?

MasterFormat is published by the Construction Specifications Institute (CSI) and Construction Specifications Canada (CSC).

What is the difference between MasterFormat and UniFormat?

MasterFormat is organized by work results and products and is used for specifications and bid estimates. UniFormat is organized by building systems and is often used for early budgets.

Do all estimates follow MasterFormat?

No. Commercial estimates usually do, but subcontractors often use a trade breakdown and homebuilders may organize by phase. We can prepare estimates either way.

Related Guides and Services